SLIPSTICK III
High Powered Rocket
Countdown to Level 3 Certification

Countdown Begins

Design and Simulation Documents

Begin Countdown
Table of Contents : Construction, test and flight data
10.. Intial preparation of parts, motor mount, modifications to fin design
9... Getting the fin can set and aligned - avbay construction
8... Tip-to-Tip Fin Reinforcement with Carbon Fiber and FG cloth
7... Avbay Sled construction
6... Nose cone, Motor Retainer Mounting, Zipperless mods, Static Ports
5... Ejection charges, Shear Pins
4... Ground Test ejection charges, Avbay Wiring, Current Schematic
3... Shakedown Test Flight 1 (aborted) Feb 2, 2008 - Avbay Revisons
2... Shakedown Test Flight 2 (Successful)- Mar 1, 2008 - K Motor
1... To the Paint Shop to be dressed in Red, White and Blue
0... April 5, 2008 - L3 Certification Flight - M Motor - SUCCESSFUL!


Rev 3-24-2008

Current Document
***Rocksim file***
Current Status

L3 CERTIFIED
Paint Scheme

All Patriotic

Performance Rocketry
Standard Kit Parts

Zipperless Design
Modified w/additional Parts

Drawing (Zipperless)

Pre-Flight Checklist

Parts List

Build Summary

Current Schematic Rev 3

Deployment Sequence

NAR L3 Certification

TRA Data Capture Form

TRA L3 Certification